Chitral Times

May 3, 2024

ﺗﻔﺼﻴﻼﺕ

Incomplete Chitral bazar byepass road deteriorating fast

Posted on
شیئر کریں:

Chitral — The Chitral bazar byepass road which has been built after a delay of 40 years, is left incomplete to face the same fate as of other projects in Chitral. The byepass road side nullas are breaking up and the black top is giving in at different places. There is no arrangement for the underground electric wiring and street lights etc for which heavy amount of money had been allocated. People from all walks of life have demanded immediate attention towards the completion of the byepass road so that people can benefit from this 50 ft wide road which is the ‘highway’ in Chitral but elsewhere it would just be a lane. — CN report, 23 Sep 2016


شیئر کریں:
Posted in UncategorizedTagged , , ,
5057