www.chitraltimes.com
Chitral City Drawn into Darkness
Due to the recent rains and Snow, Chitral City disconnected from
the national grid and due to which our district to deprived from
4MW electricity from the National grid. The local existing power is
supplied to the very few villages of Chitral. We have 4MW power
station in Reshun managed by Sarhad Hydrel development organization
(SHYDO) yet to be connected with Chitral City, but because of the
poor administration of WAPDA authorities the town area is put into
darkness for a week.
SHYDO doesn�t allow WAPDA to connect with Chitral city, because of
this miss coordination of these two-govt departments the poor
peoples of Chitral are suffering a lot of difficulties during this
severharsh cold weather. So still in 21st century uncertainty is
prevailing among the people of Chitral, the people of Chitral
became senseless and used to with such circumstances. Business
community is the main loser in such a worse situation.
When contacted with local authorities of WAPDA they reply that
their load-shading schedule is yet to be finalized. If the WAPDA
doesn�t have enough power to full fill the requirements of the
local area, if should have to distribute the existing power to
whole locality. So through this latter we want to draw the
attention of the WAPDA authorities and district government towards
the difficulties of the local people and business community.
Bashir Hussain Azad
Chitral.
|