:: Front Page

:: Your Letters

:: Articles

:: Weather Updates

:: Poetry

:: Chitral Info

:: Pictures

:: About Us

 

 

 

 

 

 

 

    December 03, 2016

Detail

 
PDWP approved 38 Projects of Rs. 23328.215 millions

Chitral Times Report

PESHAWAR: The Provincial Development Working Party (PDWP) held its meeting under the Chairmanship of Mr. Muhammad Azam Khan, the Additional Chief Secretary Khyber Pakhtunkhwa on2nd December, 2016. The meeting was attended byMr. Shahab Ali Shah, Secretary P&D Department, its members and respective administrative Secretaries. The forum considered 51 projects pertaining to different sectors including Elementary & Secondary, Higher Education, Sports & Tourism, Agriculture, Health, Social Welfare, water, Local Government, Multi Sectoral Development, Roads, ST&IT and DWSS sectors for the uplift of the province. The forum approved 38Projectswith an estimated cost of Rs. 23328.215 millions. 13 projects were deferred due to inadequate designs.

In Elementary & Secondary Education Sector approved projects were “Strengthening of Planning Cell of E&SED in KPK, Establishment of Dir Model School at Dir Upper, GGHSS at Khwaja Rashak PK-24 Mardan, GGHSS at Mir AmanKilli Jahangir Abad PK-26 Mardan, GGHSS at Bamolai, PK-97 Dir Lower, GGHSS Nishot, PK-90 Chitral, GGHSS BehramKhel (Mimatullah S/O Abdul Rahim in PK-75 Lakki Marwat, GGHSS at DabliLawager PK-41 District Karak, GGHSS Chandakhuram at VcJatta Ismail Khel PK-40 Karak” GHSS Onadherai PK-84 Swat, GHSS Kala kelay PK-83 Swat, GHS DaghaPatay PK-82 Swat, GHSS Mongay Balambat PK-94 Dir Lower, Standardization of 200 Higher Secondary Schools in Khyber Pakhtunkhwa (Phase-I) SH: GHSS Chakai Kohistan”.

In Higher Education Sector approved projects were “Establishment of GDC Razar PK-32 District Swabi, Establishment of GDC Kurram Par District LakiMarwat, Construction of building for Directorate of Higher Education, Project Management Unit for implementation of BS program and special initiatives, Establishment of 15 Govt Colleges in Khyber Pakhtunkhwa for Boys and Girls (Phase-IV) SH. Establishment of GDC Lora Abbottabad.

In Sports & Tourism sector approved projects were “Improvement, and Restoration& Rehabilitation of Existing Sports facilities in Khyber Pakhtunkhwa”.

In Health sector approved projects were “Up gradation of BHU Barshawar to RHC, District Swat, Up gradation of BHU Darmal to RHC in Tehsil Matta, District Swat, Establishment of Children & Maternity Hospital Charsadda”.

In Social Welfare sector only approved project was “Construction of Social Welfare Complex at Nowshera”.

In the Water sector approved projects were “Installation of Solar Augmentation/Irrigation Tube Wells in Khyber Pakhtunkhwa” Improvement /Construction of Canals, Channels, Drainage system and Flood Protection Structures in District Charsadda, Improvement & Up gradation of roads and Construction of Bridges along Canals/Drains in District Charsadda, Construction/ improvement of roads along canals and drains including link roads in KheshkiBala and Payan area district Nowshera, Improvement/lining of Rashakai Minor & Up gradation of Canal Patrol Road /VR Culverts along RashakaiMinor,Bara Banda Minor, Nowshera Minor &Torlandi Minor, Mardan Irrigation Division, Construction/Improvement of Irrigation Channels, Bridges, Culverts, Small storage ponds & Drainage Systems in Khyber Pakhtunkhwa, Construction /Installation of Augmentation /Irrigation Tube Wells in District Charsadda, Construction and Improvement of Irrigation Infrastructure including FPW, channels roads & Tube Wells in Adenzai and adjoining areas of District Dir Lower, Construction/ Improvement of Canal Patrol Road along Mala Minor/ Kamran ZebShaheed Road from head to tail Mardan, Improvement & Widening of Road along Pehur Main Canal & its sub System,Partugai Drainage System & other small tributaries District Swabi, Imp: of Canal Patrol Road along Lower Swat Canal, District Charsadda, Construction of Road on Right Side along Disty No. 6from Charsadda TakhtBai road crossing to Motorway Interchange and Kiramat Minor, District Charsadda, Revamping of Jindi River District Charsadda”.

In the Local Government Sector only approved project was “Development Package for District Bunir.

In the Multi Sectoral Development sector only approved project was “Tele Agri/E-Agriculture District Nowshera and Peshawar”.

In the Road sector approved projects were “F/S, Design and Construction of RCC Bridge at Ayun, Chitral, Peshawar Ring Road to Badaber via Surezai (16 KM) (Phase-I), Distt. Peshawar, Const of a) Asband Swat (3 km) b) Shursheen c) Joro Kashmir (2 km) d) Ghazo Chat Pat e) Deghan (1 km) f) DheriTesko (3 km) g) Oskai(1.5 km) i) Laiko (1 km) j) NawKalayBochake(2 km) k) MayarDogha(2 km) Dir Lower, Project Implementation Unit (PIU) ADB Assisted "Provincial Road Rehabilitation Project, Rehabilitation of internal roads in Chitral and Drosh cities, District Chitral , Re-construction of Bridge at Tor Warsak Daggar& widening/ improvement & BT of 18 KM leftover portion of Swarai Pir Qilla Puran Road, District Buner”.

In the DWSS sector only approved project was “Drinking Water Supply from Indus River to Village Rehman Abad ShakarDara along with adjacent villages, Kohat”.

In the ST & IT Sector only approved project was “Prison Management Information System in Central Jail Peshawar”.

In the Auqaf sector only approved project was “Construction and rehabilitation of DarulUloomHaqannia, AkoraKhattak.”

 

 

mail @ chitraltimes@gmail.com

| Front Page | Chitral | Advertisement | Weather | About Us | Bookmark Us |